
Power Line Pylons
These lattice towers are space trusses built from angle steel members. Every main leg is a single equal-angle bar or a built-up angle section, and the whole body holds together with shear bolts instead of site welds. Tower feet are welded from plate into a compact assembly, then bolted to the anchor stubs. By head shape, power line pylons here fall into wine-glass, cat-head, upper-T, dry and barrel forms, each tuned to a different span condition. Before packing we dip each member in hot zinc, so the steel arrives at site with a finished corrosion coat. On shorter towers we add climbing spikes along one leg, so riggers can climb without a separate ladder.
Product Parameters
|
Item |
Value |
|
Material |
Q235 / Q345 angle steel |
|
Call height |
15–60 m |
|
Connections |
Rough bolts, shear type |
|
Surface |
Hot-dip galvanized |
|
Reference standard |
GB 50017 |
Product Advantages
Section weight stays low enough for pickup trucks to haul into remote corridors. Each set of power line pylons ships with a numbered member bundle, so crews on the ground know which leg goes where without digging through drawings. Because members bolt instead of weld, a field repair only needs a wrench and a spare plate, not a welding set.
Main Applications
You will see these power line pylons on 110 kV and 220 kV overhead lines crossing farmland, rivers and hills. We tune the steel role to the job: suspension towers for straight runs, tension towers for angle sites, terminal towers at line ends, transposition towers for phase swapping, and crossing towers for long river spans.


FAQ
Q: Do you supply only the tower body, or the full line package?
A: We supply lattice towers, foundation drawings and bolt sets. Hardware such as insulators and conductors are typically bought locally by the line contractor.
Q: How is the tower packed for sea freight?
A: Members are bundled by tower type and loaded in 40 ft containers. Bolts go into separate wooden crates.
Q: What is the lead time for a standard batch of these towers?
A: About 25 to 35 days after drawing approval, depending on order volume and the galvanizing queue.
Hot Tags: power line pylons, China power line pylons manufacturers, suppliers, factory, 1690 power tower, 220 kv tower, 500 kv tower, big power line towers, Electric High Tension Tower, electric transmission tower
You Might Also Like
Send Inquiry






